Electronic Assembly - Communications Cable
Assembly and PCB Assembly
We are involved in the assembly of communication cables
for networking as well as PCB assembly. The assembly of
the communication cables as well as PCB assembly is done
by us at our well equiped Electronic assembly Workshop located
in the vicinity of our office at Ponda, Goa. On the right
you can view the Crimping of the Communication Cable. The
assembly job works done by us include Bookmark Website Bookmark
Page Contact UsSubscribe
Kitron’s Q2 Profit Down 37% YoY
Written by Chelsey Drysdale
Thursday, 12 August 2010 18:06
BILLINGSTAD, NORWAY – EMS firm Kitron reported second-quarter
2010 revenue of NOK 425.7 million, up 1.3% compared to the
same quarter last year on higher medical demand.
Profit before tax and discontinued operations
was NOK 1.7 million, down 37% year-over-year.
Read more...
EMS Deals Continue to Outpace ‘09
Written by Mike Buetow
Thursday, 12 August 2010 17:56
CHICAGO – The rebound in orders in the EMS sector has brought
with it an uptick in M&A activity.
Read more...
More Articles...
Henkel Opens New Adhesive Electronics Facility
Winland Electronics' Q2 Sales Down More than 10%
ITW Acquires Ion Systems
Foxconn's July Sales 2d Highest Ever
Nortech Continues Climb; Q2 Back in Black
API Swings to Q4 Profit on Record Sales
Fire Halts Plexus Oradea Ops
Report: Foxconn to Construct PC EMS Plant in Turkey
Nordson Merges Dage, YesTech Units
Viasystems' EMS Sales Up 21% QoQ
Columns
Problems and Promises of BTCs
What are bottom termination components? You may not know
the term “BTC,” but because IPC is focusing on these packages,
expect to hear more about them.
IPC has coined the term BTCs for descriptive package names
such as QFN, DFN, SON, LGA, MLP, etc. They are in some ways
similar to BGAs, which also have hidden terminations, but
they are also very different. They do not have balls, but
rather, metalized terminations or pads underneath the package.
Most, but not all, of BTC packages have a
large ground or power termination surrounded by smaller
signal terminations. When it comes to inspection, they pose
even more challenges than BGAs, which permit inspection
by endoscopes. You may not be able to see side solder fillets,
and even when you can, they may look non-wetted or dewetted.
But, dewetted and non-wetted side fillets in BTCs are acceptable.
Read more...
Getting 'Up' for '60 Minutes'
Rob bolted upright in bed. He had that terrible
feeling that he had overslept for an important appointment.
His eyes quickly found the clock and it said Electronic
Assembly Training Workshops
Mukul Luthra, an expert consultant with over 30 years of
electronic assembly experience in high volume manufacturing,
quality and process engineering, presents a series of hands-on
training workshops that address critical modern electronic
assembly challenges. Custom electronic assembly training
workshops are also available to meet your specific needs.
For more information: register to download
the Electronic Assembly Training Workshops brochure in .pdf
format
Workshop 1
Lead Free Interconnection – Technology and Manufacturing
This two-day course provides a solid foundation
in Lead Free Soldering from Legislation, Equipment classes
impacted, to the Metallurgical interactions and process
impacts. These are dealt with in the light of current trends,
solders and metallization with emphasis on dealing with
the many soldering issues encountered in the Lead Free conversion
process.
This workshop is divided into ten modules
that include: Lead Free drivers, inspection, soldering alloys,
soldering metallurgy, alloy options, Lead Free process considerations,
reliability, surface metallization, and process issues.
Who Should Attend: Those responsible for implementing
Lead Free technology, maintaining Lead Free yields, and
for those roles that directly impact yields in Manufacturing,
Assembly, Equipment Maintenance, Failure Analysis, Vendor
Quality, and Incoming Quality.
Workshop 2
BGAs and CSPs – Structure, Assembly Process and Rework
A two-day intensive workshop that covers in-depth
aspects of BGAs, Micro BGAs, and Bumped Array CSPs, including
their structure, families, advantages, features, assembly
of the device on the PCB and rework processes. Attendees
will acquire an excellent understanding of the attachment
variables, assembly requirements, assembly variants such
as mirror image assembly, the process issues that may be
encountered and how to troubleshoot and correct them.
This program is organized into seven modules
that include: packaging drivers and BGA trends, BGA and
Array CSP assembly considerations, imaging techniques, understanding
and eliminating defects, Chip Scale Packaging (CSP), and
rework.
Who Should Attend: Engineering personnel from
Manufacturing, Assembly, Equipment, Materials and Failure
analysis disciplines. The course is also extendable to Technicians
or Supervisory levels.
Workshop 3
Advanced SMT – Practical Approaches and Techniques for SMT
Process Enhancement
Through this two-day workshop delegates learn
about the latest trends in packages, grasp the complex interaction
between variables, and discover how to control and manage
them for a successful process. The workshop focuses on small
form factor, miniaturization and advanced packages assembly
and control. Participants also learn how to deal with typical
and difficult issues, from mainstream assembly to many of
the new devices and attachment methods.
This course has twelve modules that include:
SMT directions, process considerations, Lead Free challenges,
reflow engineering, wave soldering, soldering metallurgy,
BGA and CSP assembly and control, Chip-On-Board (COB) in
mainstream SMT, Flip Chip (FC) processes, analytical tools,
and improving rework yields.
Who Should Attend: Engineering personnel from
Manufacturing, Assembly, Equipment, Materials and Failure
analysis disciplines. The course is also extendable to Technicians
or Supervisory levels.
Workshop 4
Direct Chip Attachment in Mainstream SMT – Selection, Design
and Processing
DCA has gained tremendous importance in the
evolving field of SMT with ‘Bare Dies’ being thought of
by many as the next ‘Wave of Packaging’. This two-day workshop
covers and provides an understanding of the selection criterion
and considerations for bare dies, their quality and acquisition.
It also covers Flip Chip (FC) and Chip-On-Board (COB) attachment
technologies in terms of positioning, design guidelines
and attachment considerations, usage, equipment, process
development and analysis with real life examples.
This workshop is divided into eight modules
that include: direct chip attachment, bare dies, Flip Chip
design rules, Flip Chip attachment, failure analysis, and
Chip-On-Board attachment.
Who Should Attend: This is a high level program
that targets personnel from Engineering, Process, Manufacturing,
Assembly, Failure Analysis and Quality disciplines.
Workshop 5
Tin Whiskers – Structure, Causes, Impacts and Control Strategies
Practical, hands-on workshop. Includes over 240 examples
of good and bad design for manufacturability and assembly
practices. Includes exercises to reinforce understanding
of principles and analysis of company assemblies to transition
learning back to your workplace. The three-day workshop
includes one day on-site prior to the workshop to customized
it to your products and processes.
1. DESIGN FOR MANUFACTURABILITY/ ASSEMBLY
(DFM/A)
DFM/A Introduction
Design Impact on Cost
DFM/A Fallacies vs. Reality
2. DESIGN FOR ASSEMBLY
Principles of Design for Assembly
Simplify Product Architecture
Modularity and Structure with Architecture
Partitioning, Collocation, and Orientation Effect on Interconnections
Modular Design vs. Integral Design
Simplicity - Minimize Part Count
Minimize Parts Exercise
Standardization - Minimize Part Variety
Standardization Approach and Method
Mistake-Proof Assembly - The Six Mistake-Proofing Principles
and the Relative Benefit
Elimination Principle and Examples
Replacement Principle and Examples
Prevention Principle and Examples
Facilitation Principle and Examples
Detection Principle and Examples
Mitigation Principle and Examples
Mistake-Proofing Approach and Methodology
Mistake-Proofing Exercise - Identify Mistake-Proofing Opportunities
Assembly Process Framework
Design for Parts Feeding & Handling
Design for Part Orientation
Considering and Applying Symmetry vs. Asymmetry
Measuring Symmetry - Alpha, Beta and Combined Symmetry
Design for Location and Insertion
Minimize Flexible Parts
DFA Considerations with Gaskets, Interconnections, &
Connectors
Axes of Assembly, Reorientation & Blind Assembly
Top Down, Uni-Axis Assembly
Self-Fixturing vs. Production Fixtures
Joining & Fastening Guidelines
Integral Attachment (Self-Fastening & Snap-Fit Assembly)
Guidelines
Threaded Fastener Considerations & Guidelines
Adhesive Joining Guidelines
Welding Guidelines Electronic Assembly Manufacturer For
Sale - Orange County, California
Ad/Listing Information
Contact Information
Status: Available
Location: Orange County
County: Orange
City: None Given
Contact Broker: Steve Thomson
Primary Phone: 714-619-9310
Alternate Phone: None Given
DRE Number: None Given
Email Address: Email Advertiser
Date Started: 6/14/10
Date Last Revised: 7/23/10
BizBen Ad #: 155268
Financial Information Detailed Information
Price: $224,990
Down: Call/Email
Revenue: $320,000
Adj. Net: $50,000
Relocatable: No
Home Based: No
Real Estate Included: No
Bkr To Bkr Coop: No
Franchise: No
For Sale By Owner: No
Asset Sale: No
Lifestyle: No
Description Of This Orange County Electronic
Assembly Manufacturer Business For Sale:
This southern California based Electronic Assembly Company
has been serving local clientele for 38 years from their
north Orange County location.
Their niche is smaller jobs, where fast turnaround
is paramount. Customers include military contractors, commercial
firms, medical companies and electronics manufacturers.
Because of it's long and successful history, this company
enjoys many repeat customers.
Sales have been as high as 1.5 million over
the years, however, recently, sales and marketing efforts
have slowed. This business needs new ownership with a keen
eye toward expanding the customer base. Conference
Building on the success of the 2008 conference, the Electronics
Assembly Reliability and Yield Enhancement Summit begins
on Tuesday, 21st September with a wide range of workshops
from many of the leading experts in the field.
On Day Two, the conference starts with a Plenary
Session comprising some of the best individual paper submissions.
In the afternoon this breaks out into three dedicated tracks
and a workshop.
The specialized tracks continue on Day Three
and the conference culminates in the afternoon with the
second half of the Plenary Session.
Below is the schedule of workshops for Tuesday,
September 21st. We will be posting the full conference schedule
soon.
Tuesday, September 21st
Tuesday is dedicated to workshops. A 30-minute coffee/Blackberry
break is scheduled during both the morning an afternoon
sessions, the first at 10:30 am and the second at 3:30 pm.
Lunch runs from 12:30 pm to 2:00 pm. The tabletop exhibition
will be available during these times as well.
Morning Session
9:00am-12:30pm Afternoon Session
2:00pm-5:30pm
Workshop One
Flexible Circuit Technology – Structures, Materials, Design
Practices and Manufacturing Processes
Presented by Joe Fjelstad Workshop One
Advanced Packaging Technologies and Future Interconnection
Trends
Presented by Joe Fjelstad
Workshop Two
Enhance Quality by CIP Integrated Inspection
Presented by Thomas Ahrens, Trainalytics GmbH Workshop Two
Soldering reliability – understanding the metallurgy and
application modeling
Presented by Thomas Ahrens, Trainalytics GmbH
Workshop Three
Gerber Data Analysis in Electronic Production, Gerber3 Seminar
(part 1)
Presented by Jennifer Vincenz, The “LeiterplattenAkademie
GmbH” (i.e. “PCB-Academy”) Workshop Three
Gerber Data Analysis in Electronic Production, Gerber3 Seminar
(part 2)
Presented by Jennifer Vincenz, The “LeiterplattenAkademie
GmbH” (i.e. “PCB-Academy”)
Workshop Four
Solder Joint Reliability—Part 1: Fundamentals in Solder
Joint Reliability
Presented by Werner Engelmaier Workshop Four
Solder Joint Reliability-Part 2:
Failure Mode and Root Cause Analyses (Fatigue, Brittle Fracture,
ENIG)
Presented by Werner Engelmaier
Workshop Five
Cleaning in Electronic Production—Basic Requirement for
Long-term Reliability
Presented by Alexandra Rost, ZESTRON Europe Workshop Five
Conformal Coating
The first half is presented by Dr. Manfred Suppa, LACKWERKE
PETERS GmbH + Co KG. The second half is presented by Lars
Nielson, Nordson ASYMTEK
Workshop Six
Key Issue System Reliability, Evaluation along the Complete
Supply Chain
Presented by Viktor Tiederle, Fa. Relnetyx AG Workshop Six
Solder Paste Printing – Opening the Black Box for Continuous
High Quality Printing
Presented by Axel Lindloff, DEK Printing Machines
They are fortunate in having a long term, loyal workforce,
who would most probably stay on under new ownership. Currently
9 assemblers are employed.
The current lease expires in February of 2011
allowing the new owners the flexibility of moving the location
or renewing in the current facility.
The seller would like to retire but is willing
to stay on to help transition the business for a mutually
agreed to period of time.
Sales: 320,000
Furniture, Fixtures and Equipment: 50,000
Seller's Discretionary Cash Flow: 50,000
Asking: 224,990
Disclaimer: The information above was furnished
by the seller. Sunbelt Business Brokers of Orange Coast
or its agents have not verified the information and makes
no representations as to its accuracy or reliability.
Other Fastening Methods and Guidelines
Finishing, Adjustment & Calibration
DFA Considerations to Facilitate Test and Inspection
Applying DFA to Packaging - The Final Assembly Step
Case Studies and Benefits - Aerospace, Automotive, Electronics,
Mechanical Machinery
Design for Assembly Analysis Exercise
2. DESIGN FOR AUTOMATED ASSEMBLY (optional module)
Production Considerations for Manual, Flexible
Automation and Hard Automation
Cost / Benefit Analysis of Automation
Design for Feeding Guidelines
Feeding Systems & Orientation
Flexible Automation
Design for Robotic Assembly Guidelines
The objective of this one-day Workshop is
two fold. Firstly the workshop will lay a foundation and
understanding of the Tin Whiskers, their morphology, microstructure
and review the risks and extent of impact on the end product.
The course will detail the studied growth mechanisms and
conditions including the impact of the environment on whisker
growth and compare the various investigations and growth
propositions.
The second part of the workshop will deal
with the control aspects and the strategies for control
including for example, the use of conformal coatings to
mitigate the formation and growth of Tin Whiskers. [Conformal
coatings are mentioned here as an example as being of the
few processes actually under the control of the end user].
This program is organized into four modules
that include: Overview of Tin Whiskers, whisker growth models,
control strategies and challenges.
“Wait a minute!” he thought, “It’s Sunday.”
Read more...
Features
High Thermal Mass, Very High Lead Count SMT Connector Rework
Process
Rigorous testing found local vapor phase clearly superior
to alternative processes.
Read more...
SEA, NPI Awards Revealed
On April 6 in Las Vegas, CIRCUITS ASSEMBLY handed out its
annual Service Excellence Awards for the 18th time. The
program recognizes EMS providers and electronics assembly
equipment, materials and software suppliers, as judged by
entrants’ own customers.
Read more...
Complete PCB Assembly job work which includes
placing on components on circuit board manual as well as
machine soldering using wave soldering machine and Testing
of the assembled boards.
Assembly and Testing of communication cables.
Assembly and Testing of communication cables for interfaces
like RS-232 and RS-485.